admin's blog

Duke Heacock Industrial Building Completed in Moreno Valley, CA

Photo: 

Fullmer Construction recently completed Duke Heacock, a 400,395 square foot concrete tilt-up industrial building located in Moreno Valley, CA.

Thomas Ranch Business Park Completed in Corona, CA

Photo: 

Fullmer recently completed the three-building Thomas Ranch Business Park in Corona, CA. The second group of buildings completed for Turner Real Estate Investments by Fullmer in 2017, Thomas Ranch offers 129,315 total square feet and more than 15,000 square feet of office space.

Southern California Logistics Centre Building 18 Completed in Victorville, CA

Photo: 

Fullmer recently completed Southern California Logistics Centre Building 18, the latest addition to the master planned 8,500-acre transportation hub in Victorville, CA. Located minutes from the 15 freeway, Fullmer developed the project with developer Stirling Development as part of the 2,500-acre master planned industrial portion of the complex, known as the Southern California Logistics Centre, which is conveniently located adjacent to the Southern California Logistics Airport.

Wolverine Distribution Center Completed in Beaumont, CA

Photo: 

Fullmer recently completed the new 720,000 square foot build-to-suit Wolverine Distribution Center in Beaumont, CA. Positioned with exceptional visibility off the 60 freeway, the facility serves as the new West Coast distribution hub for Wolverine Worldwide, a global distributor of major footwear brands including the trademark Wolverine work boots.

Fullmer is Hiring!

Photo: 

Fullmer Construction is currently hiring for the position of a skilled Field Laborer. Please review the job description below. If interested, send your resume to alabrada@fullmerco.com

FIELD LABORER 

Job Description:

West Fontana Logistics Center Completed in Fontana, CA

Photo: 

Fullmer has completed construction of the West Fontana Logistics Center, built for developer Panattoni Development Company. The 135,651 square foot state-of-the-art Class A spec facility is situated on a 6 acre site in the southwestern portion of the city of Fontana, within the Southwest Industrial Park.

California and Campus Project Completed in Ontario, CA

Photo: 

Fullmer Construction recently completed a two-building project for Panattoni Development in Ontario, CA. California and Campus offers one building at the corner of Campus Avenue and California Street, with a smaller facility located a block away at Sunkist Street and Caldwell Avenue. The project began with removing what was left of the old Sunkist bottling plant, as well as dismantling and reconstructing the old Sunkist water tower, now preserved across the street.

Fullmer Hosts Groundbreaking Ceremony For Sierra Lakes Commerce Center in Fontana, CA

Photo: 

Fullmer broke ground last week on a new speculative 598,000 square foot Class A distribution center in Fontana, CA. The project, situated in a prime Inland Empire West location on a 27.5-acre site along Sierra Avenue and Interstate 210, will also feature 2,000 square feet of  office space. The building is scheduled to complete in early 2018.

Fairfield Ranch Commons Completed in Chino Hills, CA

Photo: 

Fullmer recently completed a group of buildings for Turner Real Estate Investments at Fairfield Ranch Road and Monte Vista Avenue in prestigious Chino Hills, CA. Fairfield Ranch Commons consists of three new industrial buildings at 321,549 total square feet with more than 26,000 square feet of office space.

Soto Industrial Building Completed in Vernon, CA

Photo: 

Fullmer recently completed the 118,714 square foot Soto Industrial Building, built for developer Pacific Industrial in Vernon, CA. The new state-of-the-art Class A spec facility is situated in the heart of LA County; sitting on a nearly 5 acre site, the building is ideally located near the vital 5, 10, 60 and 710 freeways with nearby access to LAX and major ports.

Syndicate content