United Refrigeration

Fullmer Construction completed a 50,320 square foot building expansion to the United Refrigeration distribution facility in Ontario, CA.

The project consisted of adding on to the existing facility by directly adjoining the new space, all while Fullmer seamlessly navigated the logistics of allowing United Refrigeration’s operations to continue without disruption. Ten additional rollup doors now exist, greatly expanding both the capacity and efficiency of the building by utilizing what was previously an empty field. Additional features include 32′ ceiling clear height, scrim insulation, bulk storage warehouse lighting and refreshing new landscaping to roughly 75% of the site. Two new wall louvers and two new roof top exhaust fans were also added to the existing building.