Under Construction

Citrus Commerce Center

Three building development totaling nearly two million square feet, located in a prime Inland Empire West location.

Fontana, CA

1,837,720 square feet overall

June 2017

  • Three concrete tilt-up distribution buildings
  • Building 1: 630,784 square feet
  • Building 2: 1,004,008 square feet
  • Building 3: 202,928 square feet
  • Three of five buildings near this intersection currently under construction by Fullmer

IPT Perris Distribution Center

864,000 square foot cross-dock concrete tilt-up industrial building.

Perris, CA

864,000 square feet

June 2017

  • 36' clear height
  • 8" reinforced concrete slab
  • 180' and 232' secured truck courts
  • Ample parking for both trailers and autos
  • Close proximity to 215 freeway

Wolverine Distribution Center

720,000 square foot build-to-suit concrete tilt-up distribution center. Built for Wolverine Worldwide, one of the world's leading brands in work boots and footwear. 

Beaumont, CA

720,000 square feet

June 2017

  • First building of three building master planned project
  • Prime location with excellent freeway visibility off the 60 freeway
  • Multiple points of direct access to 10 and 60 freeways
  • Crossdock facility
  • Ability for future 580k square foot expansion

Pomona Distribution Center

Professional business park consisting of six state-of-the-art shell concrete tilt-up buildings with tenant improvements. 

Pomona, CA

433,493 square feet

June 2017

  • Situated on 19.89 acres
  • Build-to-suit offices with mezzanine
  • 120' and 125' securable truck courts
  • Quick access to 71, 60, 57 and 10 freeways

Slover Commerce Center

671,557 square foot speculative concrete tilt-up distribution warehouse including 10,618 square foot office. 

Fontana, CA

671,557 square feet

July 2017

  • Developer: Alere Property Group
  • Prime Inland Empire West location at Etiwanda and the 10 Freeway
  • 5 miles from Ontario International Airport
  • 40' clear height

Southern California Logistics Centre Building 18

370,660 square foot concrete tilt-up industrial building.

Victorville, CA

370,660 square feet

July 2017

  • Developer - Stirling Development
  • 32' clear height
  • "Green" building design features
  • Fifth project built by Fullmer at the 8,500 acre Southern California Logistics Airport
  • 47% pre-leased to Plastipak

The Walk

New two-building medical office complex, full remodel of a third building and new three-story parking structure.

Newport Beach, CA

134,460 square feet overall

August 2017

  • Two new three-story steel–framed buildings
  • Full rehab to existing third building
  • Three-story parking garage
  • Built adjacent to open businesses, displaying Fullmer’s flexibility & capability to adapt

Pacific Bandini Center

New state-of-the-art build-to-suit manufacturing facility.

Vernon, CA

264,594 square feet

December 2017

  • Developer - Pacific Industrial
  • New build-to-suit bottling and distribution facility for well-known organic tea maker
  • 9,220 square foot two-story office space
  • Prime street frontage in heavy industrial area
  • Direct access to 710 freeway and nearby LAX