Alessandro Commerce Center
Fullmer recently completed Alessandro Commerce Center, 2 distribution buildings totaling 808,490 square feet in Riverside, CA. Located on 54 acres, with direct access to the I-215 freeway, the center is located in the developing area near March Air Force Base.
Warehouses feature 32-36’ clear height, ESFR sprinklers systems, 2.5% skylights, 2,000 – 3,000-amp service, 50’ x 52’ column spacing and 7” reinforced slab floors. Both buildings have fully secured, 100% concrete truck courts: 185’ (north) and 190’ (south). Building 1 offers 91 trailer parking spaces which can expand to 177 when including the adjacent lot, and 337 car parking spaces. Building 3 offers 49 trailer parking spaces expandable to 135 when including the adjacent lot, and 213 car parking spaces.
This project was a major undertaking and it did not come without its issues and delays. Explosives had to be used to clear the site of huge boulders, and the rocks had to be removed from the area. Offsite improvements included a traffic signal, 3,000 feet of new street, underground utilities, and the relocation of a 54’ high pressure water main.
- Building 1: 596,090 square feet / 84 dock doors / 8 drive-through doors
- Building 3: 212,400 square feet / 39 dock doors / 2 drive-through doors